
- Client
- Waterman Infrastructure & Environmental
- Location
- Gateshead / Newcastle upon Tyne
- Services
- Rope access, confined space entry, RIB boat support
A full tactile inspection of one of the UK's most complicated footbridges, delivered early.
The challenge
The Millennium Bridge is in constant public use, tilts to let river traffic pass, and requires a mix of access methods just to reach every part of it. A full principal inspection meant covering the topside, deck soffit, cables, arch exterior and arch interior, using rope access, confined space entry and a RIB boat on the Tyne, all on the same job.
The approach
Brought in against a tight deadline, our team delivered the complete principal inspection across every one of those access methods, working around the bridge's tilt cycles, river traffic and public footfall throughout. Every element specified in the brief was accessed and inspected in full.



The result
It's the kind of structure most contractors would shy away from, or bring in several separate specialist teams to inspect properly.
